9th February: Plastering of the Sanctuary
5th February: Site visit with the architect & Canon Montjean – Scaffolding inside the drum built to be able to reinstate the restored windows and finish repairs
4th February: Plastering around the lower and upper windows of the Sanctuary
3rd February: Plastering around the lower and upper windows of the Sanctuary
2nd February: Stained glass windows back in place in the Sanctuary – Plastering around the upper windows – Improvement of the lighting rod protection
1st February: Outside Scaffolding being dismantled – Progress of the inside scaffolding – Plastering of the walls
29th January: Upper Cornice restored – Plastering of the inside – Lightning rod
27th January: Gutters back in place and protection against birds – inside plastering of the walls of the sanctuary
26th January: Improvement of the lighting rod protection – The upper cornice restored
25th January: View of the inside scaffolding in the dome drum
14th January: Site visit by our architect Mark Pearce
13th January: The upper cornice of the dome is now restored – View of the inside scaffolding in the dome drum
5th January: The upper cornice of the dome is repainted in its original color
16th December: Site Visit – Brickwork repointing nearly finished – 1st stained glass windows back in place – Gutters repaired and back in place – Building repairs inside
7th December: Visit of the factory (Design Lights Stained Glass Limited) where the stained glass windows are repaired. A new glass window, made with copper, was created to match the existing ones already on the dome.
16th November: Ongoing works: Repointing brickworks & concrete repairs on the dome
4th November: Ongoing works: Repointing brickworks & concrete repairs on the dome – Your Canons on the Dome at sunset
21st October: Ongoing works: Repointing brickworks & concrete repairs on the dome – Canon Montjean and his “beloved Dome”
17th October: Ongoing works: Repointing brickworks – concrete repairs on the dome
16th October: Ongoing works: Repointing brickworks – concrete repairs on the dome
10th October: Ongoing works: Repointing brickworks – concrete repairs have started on the dome (corroding ferrous metal reinforcement)
7th October: Ongoing works: Roof repairs have started – Visit of a professional team
23rd September: Ongoing works: The windows of the dome are down for restoration
10th September: Scaffolds are now completed
09th September: ongoing works: gutters are now down for restoration
26th August: Architect’s visit
15th August: Panoramic views from the top of the scaffolds
14th August: Ongoing works
11th August: Canon Montjean’s visit
6th August: Scaffolding works – day 29
3rd August: Scaffolding works – day 26
24th July: Scaffolding works – A crane lifted the beams around the dome
20th – 23rd July: Scaffolding works – Preparation of the beams for the dome’s scaffold
20th July: The first windows are taken down for restoration
17th July: Visit of our architect, Mark Pearce (from Kepczyk Pearce Sanderson)
17th July: Scaffolding works – day 15
15th July: First pictures of the walls, after the plaster being removed to allow them to dry
14th July: Scaffolding works – day 12
10th July: Scaffolding works – day 10
9th July: Scaffolding tour
8th July: Scaffolding works – day 8
7th July: Scaffolding works – day 7
6th July: Scaffolding works – day 6
1st July: Scaffolding works – day 3
30th June: Scaffolding works – day 2
29th June: Arrival of the scaffolds for the Sanctuary
24th June: Protection of the Sanctuary and the side aisle